Cost Data – Page 16

  • This 250m diameter roof clads the largest indoor sports facility in the world. Called Aspire, it is located in Qatar and will host the 15th Asia Games in December
    Features

    Specialist cost update: Envelopes

    2006-10-20T00:00:00Z

    Building envelopes account for up to £25bn a year in construction costs. In our latest specialist update, our expert team at Gardiner & Theobald examines the trends and costs in curtain walling, roofing and stone construction

  • The Lowry Centre in Salford combines art galleries and theatres. It was designed by Michael Wilford & Partners
    Features

    Cost model: Museums

    2006-09-29T00:00:00Z

    Museums and galleries have to be more high-tech, sustainable and visitor-friendly than ever before. Neal Kalita of Davis Langdon runs through the funding, design and environmental issues as well as breaking down the costs of a new-build extension for a museum

  • This naturally ventilated Essex office was designed by Aukett Fitzroy Robinson. It was built on a sloping site, so the lowest floor is above ground at the front of the building, but below it at the rear
    Features

    Whole-life costs: Basements

    2006-09-22T00:00:00Z

    In this quarter’s comparison of whole-life costs, David Weight of Currie & Brown digs deep into the financial pros and cons of adding a basement or half-basement to your building

  • Features

    What it costs: photovoltaics

    2006-09-22T00:00:00Z

    Photovoltaics may help reduce energy costs, as well as cutting CO2 emissions. Peter Mayer of Building LifePlans looks at the options and whole-life costs of PV systems

  • Features

    Cost update: September 2006

    2006-09-08T00:00:00Z

    In this quarterly update on industry materials and labour, Peter Fordham of Davis Langdon reports on the impact of commodity prices – plus, how copper is becoming a precious metal and the going rates for heating and ventilation workers

  • The flexibility of construction management was an advantage in the highly complex Time and Space planetarium project in Greenwich Park
    Features

    Procurement: Construction management

    2006-09-01T00:00:00Z

    Even in these risk-averse days, some hands-on clients still prefer the construction management route. But would more schemes benefit from the CM approach? And how should clients organise themselves to get the best results?

  • Features

    Cost model: Social housing

    2006-08-11T00:00:00Z

    Our series on projects worth less than £1m returns with an in-depth look at affordable homes. Max Wilkes of Davis Langdon explains what kinds of schemes the Housing Corporation wants for its money, and breaks down the costs

  • The flagship Manhattan store of handbag maker Longchamp boasts a three-storey cascading staircase designed by Thomas Heatherwick and made from 55 tonnes of steel. The engineer was Packman Lucas
    Features

    Specialist costs: Retail fit-out

    2006-08-04T00:00:00Z

    Retail fit-out offers repeated high volumes of work as well as high-end one-off projects. Neal Kalita of Davis Langdon outlines the particular demands of high street fit-outs, details the procurement and project management issues and breaks down the refurbishment costs

  • Features

    What it costs: water softening

    2006-08-04T00:00:00Z

    You can treat hard water with chemicals or condition it with electricity but one thing’s for certain – if you want to meet Part L1, you’re going to have to do something about it. Peter Mayer of Building LifePlans counts the costs of the various options

  • An example of a glass lift and liftshaft designed by engineer WSP and installed by Mitsubishi
    Features

    Specialist cost update: Services

    2006-07-14T00:00:00Z

    The services sector accounts for more than a quarter of construction by value. In our latest specialist update, the expert team at Gardiner & Theobald take a look at the latest trends and costs in the mechanical, electrical and plumbing, lifts and escalators and ICT markets

  • Features

    Costs: Curtain wallings

    2006-07-07T00:00:00Z

    Curtain walling looks simple, but it’s a complex network of systems and components. Peter Mayer of Building LifePlans examines the whole-life costs and performance of all of them

  • Integrated steel 3
    Features

    Whole-life costs: Concrete vs steel

    2006-06-23T00:00:00Z

    What are the environmental, capital cost and lifetime cost differences between a building with a steel frame and one built using concrete? David Weight of cost consultant Currie & Brown applies the firm’s Live Options modelling system to find out

  • At developer Stanhope’s 14,300 m² Chiswick Park, west London, buildings are clustered and retail outlets brought within the office shells to create a mini-community
    Features

    Cost model: Business parks

    2006-06-16T00:00:00Z

    Business parks are back, but this time they need to be sustainable and mixed-use. Neal Kalita of Davis Langdon examines how developers can meet the evolving needs of planners and occupiers without breaking the bank

  • Features

    Cost update: June 2006

    2006-06-09T00:00:00Z

    In this quarter's focus on the costs of industry materials and labour, Peter Fordham of Davis Langdon reports on the impact of record global commodity prices

  • Features

    Costs: Liquid roof waterproofing systems

    2006-06-02T00:00:00Z

    Liquid roof waterproofing systems offer a versatile range of options. Peter Mayer of Building LifePlans reviews these and their whole life costs

  • The Forest Road Primary Care Centre in Enfield, north London, was designed by Dransfield Owens
    Features

    Cost model: Primary healthcare

    2006-05-26T00:00:00Z

    In the latest of our series of cost models for projects of less than £1m, Max Wilkes of Davis Langdon takes a look at the design considerations, funding, procurement, wider development issues and costs involved in the construction of a new-build primary healthcare centre

  • Features

    Costs: Energy for sports facilities

    2006-05-19T00:00:00Z

    Sports facility specifiers are under pressure to find energy-efficient heating. Anthony Waterman of Sense Cost Consultancy considers radiators vs underfloor heating for changing rooms

  • Building work on Foster and Partners’ Tanaka Business School at Imperial College London was carried out by contractor Exterior after a two-stage tender
    Features

    Procurement: Two-stage tendering

    2006-05-12T00:00:00Z

    In the second of our procurement series, Simon Rawlinson of Davis Langdon takes a look at two-stage tendering and how to get the best out of the early appointment of the contractor

  • Features

    Costs: Entrance flooring systems

    2006-05-05T00:00:00Z

    Entrance flooring systems tend to be short-life components with high whole-life costs. Peter Mayer of Building LifePlans assesses options and costs for entrance matting

  • The A4500 in Northampton has been refurbished, using Charcon Yorkstone and Sandstone setts, to serve Upton, a 43 ha English Partnerships growth area
    Features

    Cost model: Infrastructure

    2006-04-28T00:00:00Z

    Neal Kalita of Davis Langdon looks at the design considerations, procurement issues, financial risks and sustainable technologies associated with the delivery of infrastructure for a brownfield, mixed-use development