- News
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- Building the Future
- Jobs
- Data
- Subscribe
- Events
2024 events calendar
Explore nowBuilding Awards
Keep up to date
- Building Boardroom
All the latest updates on building safety reform
2024 events calendar
Explore nowBuilding Awards
Keep up to dateSpecification options: Insulated render systems | ||
Capital cost | Net present value for 60 years | |
£/ m2 | £/ m2 | |
Polymer modified cementitious insulated render system | 75 | 213 |
External insulated thin render system with acrylic finish coat | 80 | 209 |
External insulated thin render system with silicone finish coat | 95 | 207 |
External insulated thin render system with 80mm wood fibre insulation, mechanically | ||
fixed, thin render system with silicone finish coat | 95 | 207 |
Table notes: A discount rate of 3% is used to calculate net present values. Systems comprise 80mm expanded polystyrene insulation, mechanically fixed, base coats with glass fibre reinforced mesh, mechanical fixings, stainless steel trim and PVC edgings unless otherwise detailed. Costs in use include allowances for inspections, cleaning, sealant replacement, minor repairs and a major refurbishment in year 30. Costs vary with the size of the project, extent and complexity of detailing, access and finish selected. Costs are generally lower for larger projects. Costs are indicative and represent the average of a range. A cost analysis based on project specific information is essential for a realistic best value appraisal. The LCC values are sensitive to the assumptions made about maintenance. BLP Insurance provides latent defect warranties for buildings www.blpinsurance.com |