Keep up to dateAreas required for the production of 1kWp | ||
Efficiency | Area required | |
Monocrystalline | 15% | 8m2 |
Multicrystaline | 13% | 10m2 |
Amorphous | 7% | 20m2 |
Comparative cost and performance | ||||
LZC System | Typical output | Capital cost (£) | Carbon reduction (Kg CO2/pa) | Payback period (years) |
Micro CHP | heating: 18,000kWh, electricity: 2,400kWh | 1,000-3,000 | 600/kWp | 3-4* |
Biomass | 20kW | 5,000-6000 | 0.3/kWh | na |
Ground source heating | 8kW | 800-1,400** | 0.1/kWh | na |
Wind (very small scale) | 1kW | 1,500-3,000 | 0.41/kWh | 30+ |
Wind (small scale) | 1.5-6kW | 4,000-18,000 | 0.4/kWh | 20-30 |
Photovoltaic cells | 1.5-2.0kWp | 4,000-9,000/kWp | 300/kWp | Up to 120 |
Solar panels, flat plate | 3kW | 2,000-3,000 | 0.2/kWh | 10+ |
Solar panels, evacuated tube | 3kW | 3,500-4,500 | 0.2/kWh | 10+ |
** excludes civil works and underfloor distribution * payback based on extra cost compared to conventional boiler |