Keep up to dateBase building, hospital ward extension, 22.5 m deep on plan | |
These costs are slightly lower than an average hospital because ward areas are cheaper than highly serviced areas such as operating theatres | |
Basic information | |
Gross internal floor area: 9000 m2 | |
Upper floors: 300 mm reinforced concrete. | |
Substructure: 200 mm ground-bearing slab | |
Roof pitched: “Sarna” single membrane proprietary roofing system with parapets | |
External walls: 60% terracotta rainscreen cladding, 40% rendered masonry wall | |
Windows: Based on 35% of the 2.9 m clear height – 45% is polyester powder-coated | |
Lifts: four passenger/bed lifts | |
Capital costs (£) (excluding fees) | |
Substructure | £717,350 |
Structure | £1,482,485 |
External envelope | £1,305,408 |
Internal divisions | £1,662,537 |
Finishes | £1,420,402 |
Fittings | Excluded |
Mechanical | £2,734,162 |
Electrical & communications | £1,963,422 |
Lifts | £340,000 |
Preliminaries, Ohs & profit | £3,313,241 |
Total | £14,938,641 |
(Excludes allowances for price & design risk, and construction contingency) | |
Net present costs for energy consumption (£) | |
Space heating | £75,313 |
Fans | £25,402 |
Lighting | £474,716 |
Other energy costs | £582,646 |
Total (over 30-year period) | £1,158,077 |
Net present costs of maintenance and replacement over 30 years and discounted at 3.5% (Limited to just the key elements that are changed) | |
Gutters and balustrading to roof edge | £9,801 |
Window cleaning equipment | £55,707 |
Walls | £192,380 |
Windows | £59,354 |
Partitions | £28,059 |
Heat source | £160,075 |
Mechanical ventilation | £518,234 |
Transformers and stand-by generator | £33,894 |
Light fittings | £135,792 |
Net present cost for base building (excluding soft FM items such as cleaning, rates and porterage) | £1,193,296 |
Changes in energy costs | ||
Cost/yr £ | Percentage change | |
Fabric heat losses | 762 | 34.2% |
Solar gains | –158 | 48.8% |
Heat gains from lights | 97 | –7.0% |
Fans | –4 | –0.3% |
General power Pumps and controls | 710 | 42.9% |
Lighting | –2757 | –7.0% |
TOTAL CHANGE PER YEAR | –1350 | |
YP = | 18.392 | |
NPC over 30 years discounted at 3.5% p.a. | –24,829 |