| Percentage increases in capital costs* | |||||
| BREEAM score (and rating) for the base case | % increase for pass | % increase for good | % increase for very good | % increase for excellent | |
| Location | |||||
| Poor location | 25.4 (pass) | 0% | 0% | 2% | – |
| Typical location | 39.7 (pass) | – | 0% | 0% | 3.4% |
| Good location | 42.2 (good) | – | – | 0% | 2.5% |
| * A small overall cost saving was identified resulting from the removal of air-conditioning equipment in the computer/server room thereby enabling increased performance at no extra cost | |||||