Keep up to dateIndicative all-in estimating rates * | ||
Gifa of less than 2000 m2 Cost/m2 gifa | Gifa of more than 1900 m2 Cost/m2 gifa | |
Functional – non air-conditioned | 600-700 | 550-650 |
Medium quality – non-air-conditioned | 650-800 | 600-750 |
High quality – air-conditioned | – | 750-1 100 |
High quality – mixed-mode ventilation | – | 1 000-1 500 |
* Business-park office buildings finished to Category A standard. |
Building element all-in cost planning rates | ||
Unit | Rate £/m2 | |
Substructure | ||
Reinforced concrete column bases and ground slab on hardcore base | Ground-floor plan area (m2) | 55-65 |
Frame and upper floors | ||
Composite construction. Structural steel columns and beams on a 9 × 9 m grid, fire protection, lightweight concrete suspended slab on profiled steel decking | Upper-floor plan area (m2) | 70-80 |
Frame and upper floors | ||
Insitu concrete flat slab and columns on 6 × 6 m grid | Upper floor plan area (m2) | 70-85 |
Roof | ||
Asphalt and insulation, including allowance for upstands and accessories (roof structure excluded) | Roof plan area (m2) | 45-50 |
External walls and windows | ||
Brick/block walling with insulated cavity. Aluminium framed double-glazed units | External wall and window area (m2) | 250-300 |
External walls and windows | ||
Curtain walling, sealed double-glazing units, precast concrete cladding panels | External wall and window area (m2) | 400 |
Space heating and air treatment | ||
Heat source, chillers and air handling plant, distribution to plant rooms and risers | Gross internal floor area (m2) | 50-80 |
Electrical works | ||
Mains and sub-mains. Lighting and small power to landlord’s areas. Power supply to main plant | Gross internal floor area (m2) | 25-35 |
External works | ||
Clay block paviors, sand bedding and MOT, to access roads, including lighting and drainage | Access road area (m2) | 45-50 |
Indicative rates for furniture, fittings and equipment* | |
£/m2 gifa | |
Budget | 125-150 |
Mid range | 250-275 |
Luxury | 300-400+ |
*Cost includes preliminaries. |
Indicative all-in estimating rates* | |||
Average gifa per room (m2) | Cost (£/m2 gifa) | Cost (£000/bed) | |
Luxury city-centre hotel – multistorey conference and wet leisure facilities | 70-130 | 1 400-1 700 | 120-180 |
Business town centre/provincial hotel – 4-6 storeys, conference and wet leisure facilities | 70-100 | 1 000-1 200 | 85-120 |
Mid-range provincial hotel – 2-3 storeys, conference and leisure facilities | 50-60 | 1 000-1 250 | 50-75 |
2-3 storeys, bedroom extension | 33-40 | 750-1 100 | 25-40 |
City centre aparthotel – 4-7 storeys, apartments with self-catering facilities | 50-60 | 800-1 050 | 40-65 |
Budget city-centre hotel (new build) – 4-6 storeys, dining and bar facilities | 35-45 | 850-950 | 30-43 |
Budget city-centre hotel (office conversion) – 4-6 storeys, excluding dining facilities | 32-38 | 650-1 050 | 20-40 |
Budget roadside hotel – 2-3 storey lodge, excluding dining facilities | 28-35 | 800-900 | 24-30 |
*The rates include fittings, furniture and equipment. |
Hotel accommodation costs* (for mid-range new-build hotel development) | |
Functional area | £/m2 |
Bedroom areas | 550-780 |
Front of house and reception | 720-950 |
Restaurant areas | 800-1 200 |
Bar areas | 700-1 100 |
Function rooms/conference facilities | 600-1 100 |
Dry leisure | 550-650 |
Wet leisure | 1 150-1 500 |
* Costs include preliminaries but exclude furniture, fittings and equipment. |
Indicative all-in estimating rates – urban offices* | |||
Low-rise Cost £/m2 gifa | Medium-rise Cost £/m2 gifa | High-rise Cost £/m2 gifa | |
High-quality speculative offices – air-conditioned | 850-1 050 | 900-1 250 | n/a |
– mixed-mode ventilation | 1 050-1 500 | 1 150-1 600 | n/a |
High-quality speculative offices in the City of London (fitted out to category A) – air-conditioned | n/a | 1 350-1 600 | 1 400-1 800 |
High-quality offices in the City of London for owner occupation (fitted out to category B) – air-conditioned | 1 150-1 300 | 1 700-2 400 | 2 000-2 600 |
* Rates include developer’s finish. Prices at South-east levels, except for City of London offices. |
Building element all-in cost planning rates* | ||
Unit | Rate £/m2 | |
Substructure | ||
Piled foundations, single level basement, including excavation and retaining walls with drainage cavity | Basement plan area (m2) | 1 250 |
Structural steelwork | ||
Standard sections | Tonne | 950 |
Structural steelwork | ||
Lattice beams/cellular beams for clear-span construction. | Tonne | 1 175 |
Frame and upper floors | ||
Composite construction. Structural steel columns and plate girders on 9 × 14 m grid, fire protection, lightweight concrete on profiled steel decking | Upper-floor plan area (m2) | 180 |
External walls | ||
Natural stone cladding on precast concrete cladding panels complete with aluminium-framed double-glazed punch-hole windows | External wall area (m2) | 760 |
External walls | ||
Silicon bonded glazed curtain walling. Double glazed with toughened outer and laminated inner layers | External wall area (m2) | 600 |
Mechanical services | ||
Shell and core installation including boilers, chillers, air-handling plant, distribution in risers and controls, toilet and general ventilation | gifa (m2) | 100 |
Mechanical services | ||
Four-pipe fan-coil air-conditioning comprising fan-coil units, chilled water, low-temperature hot water and air distribution on office floors and controls. (Average 1 FCU per 27 m2 NLA at perimeter and 1 FCU per 50 m2 NLA in internal zones.) | nifa (m2) | 120 |
Electrical services | ||
Shell-and-core installation including mains and submains installation, distribution in risers, lighting and small power to landlord’s areas, power to main plant standby generation | gifa (m2) | 50 |
Electrical services | ||
Fit-out to office areas including luminaires, lighting control, small power to fan-coil units and floor outlet boxes | nifa (m2) | 65 |
Lift installation | ||
16-person traction lift, 10 stops, 2.5 m/sec | Item | 110 000 |
* Rates at central London price levels are related to City/West End office construction. |
Indicative all-in estimating rates – supermarkets* | |
Cost £/m2 gifa | |
Shell | 250 - 600 |
Supermarket fit-out | 900-1 200 |
Hypermarket fit-out | 400-800 |
* Rates include store fit-out. |
Building element all-in cost planning rates | ||
Unit | Rate £/m2 | |
Substructure | ||
Pad and ground beam foundations, reinforced insitu concrete ground slab, incorporating service ducts | Ground floor plan area (m2) | 85-105 |
Frame | ||
Steel frame with lattice steel roof trusses, Z purlins | gifa (m2) | 75-100 |
Roof | ||
Single-layer PVC roofing, insulation, on steel decking | Roof plan area (m2) | 50-60 |
External walls | ||
Cavity walling with facing brickwork | External wall area (m2) | 55-70 |
Floor finishes | ||
Terrazzo tiles | Floor area (m2) | 50 |
Furniture and fittings | ||
Fitting out to sales, staff and storage areas. Signage, shelving, racking and checkouts (excluding refrigerated cabinets) | gifa(m2) | 75-100 |
Furniture and fittings | ||
Checkout desks, including scanner, scales and belts (excluding cash tills) | Item | 5 000-8 000 |
Services equipment | ||
Refrigeration installation, complete, including cabinets and cold rooms | gifa (m2) | 150-230 |
Space heating and air treatment | ||
Air-conditioning installation including heat source, chillers and air-handling units, distribution and insulation, controls | gifa (m2) | 110-130 |
Electrical installations | ||
Mains and sub-mains, power to main plant, small power, lighting and display lighting, fire alarm, lightning protection and security installation | gifa (m2) | 110-125 |
Petrol filling station | ||
with forecourt | Item | 400 000 |
with forecourt and carwash | Item | 600 000 |
Housing | ||
Social housing | Unit size m2 | Unit cost £/m2 gifa |
Terraced; two bed | 65 | 430-480 |
Semi-detached; three bed | 90 | 440-500 |
Low-rise flats; two bed | 62 | 540-700 |
Medium-rise flats; two bed | 62 | 590-800 |
High-quality apartments (Inner London price levels) | Unit cost £/m2 gifa | Unit cost saleable area |
Three- to four-storey villa | ||
Load bearing construction limited finishes LTH | 800-950 | 950-1 100 |
High-quality multistorey apartments. | ||
Framed cladding and curtain walling | 1 300-1 500 | 1 550-1 800 |
Student residences | Unit size m2/student | Unit cost £/m2 gifa |
Large budget scheme with ensuite accommodation | 18-20 | 650-850 |
Smaller schemes (40-100 units) with mid-range specifications, some with ensuite bathroom and kitchen facilities | 19-24 | 850-1 100 |
Smaller high-quality courtyard schemes, college style, in restricted city-centre sites | 24-28 | 1 100-1 600 |
Accommodation for the elderly | Unit cost £/m2 gifa | Unit cost £/bed space |
Residential homes | 500-800 | 16 000-34 000 |
Nursing homes | 700-950 | 23 000-66 000 |
Car parking | ||
Unit size m2/car | Unit cost £/m2 gifa | |
Surface | 20-22 | 35-50 |
Surface landscaped | 20-24 | 60-85 |
Grade and upper level | 23-30 | 120-180 |
Multistorey flat slab | 23-30 | 220-280 |
Semi-basement naturally ventilated | 25-30 | 290-340 |
Football stadia | ||
Unit cost £/m2 gifa | ||
Basic stand | 350-700 | |
Medium quality including basic facilities | 600-1 100 | |
High quality including extensive facilities | 1 100-1 300 | |
National stadium including extensive facilities | 2 000-3 000 | |
Distribution centres | ||
Unit size ( gifa) 2 000-10 000 m2 Unit cost £/m2 gifa | Unit size ( gifa) 10 000 m2 Unit cost £/m2 gifa | |
Low bay; speculative | 220-310 | 200-260 |
Low bay; owner occupied | 330-570 | 295-535 |
Low bay; owner occupied and chilled | 475-950 | – |
High bay; owner occupied | 535-775 | – |
Secondary school and further education college buildings | ||
Usable space (m2)/gifa | Unit cost £/m2 gifa | |
Classrooms | 0.71 | 640-800 |
Laboratories | 0.82 | 660-1 000 |
Craft design and technology | 0.79 | 650-1 000 |
Music | 0.77 | 980-1 150 |
Theatres and performing arts buildings | ||
Unit cost, £/m2 gifa | ||
Large theatre (more than 500 seats) new build | 1 800-2 500 + | |
Refurbishment | 1 000-2 000 | |
Studio/workshop theatre new build | 900-1 500 | |
Industrial buildings | ||
Complexity of services installation | ||
Heating and lighting for office areas | Mechanical ventilation for office area, services to production area | |
Size of unit (gifa) | Cost £/m2 gifa | Cost £/m2 gifa |
500-1 000 m2 | 275-450 | 450-660 |
1 000-2 500 m2 | 220-400 | 350-600 |
greater than 2 500 m2 | 220-400 | 400-600 |
Learning resource centres and libraries | ||
Unit cost £/m2 gifa | ||
Learning resource centre – economical | 800-1 000 | |
– high quality | 1 000-1 500 | |
Collegiate library; including fittings | 1 750-2 100 | |
Office fit -out | ||
Indicative costs for fit-out of City/West End office space from shell-and-core condition (central London prices) | ||
Specialist area | Unit cost £/m2 nifa | |
General office space – open plan | 470-530 | |
General office space – part cellular | 630-850 | |
Senior executive offices | 1 150-1 450 | |
Meeting areas | 580-850 | |
Conference suites | 1 250-1 450 | |
Back of house / storage | 470-530 | |
Restaurant | 1 580-2 300 | |
Kitchen | 1 900-2 400 | |
Indicative costs for fit-out of out-of-town office space from shell and core condition (Central London price levels) | ||
Specialist area | Unit cost £/m2 nifa | |
General office space – open plan | 370-420 | |
General office space – part cellular | 470-580 | |
Reception area | 900-1 150 | |
Back of house / storage | 260-420 | |
Costs are based on net internal areas. Furniture, IT wiring and equipment are excluded. | ||
Museums and art galleries | ||
Unit cost £/m2 gifa | ||
International standard art gallery | 1 700-2 400 | |
National-standard museum | 1 900 + | |
National-standard art gallery | 1 400-1 700 | |
National-standard independent specialist museum (excluding fit-out) | 1 300-1 600 | |
Independent commercial art gallery | 750-1 000 | |
Refurbishment of historic building to create international standard gallery | up to 3 800 | |
Leisure centres | ||
Indicative area m2 gifa | Unit cost £/m2 gifa | |
Dry leisure centre | 1 000-1 500 | 600-850 |
Swimming pools | 1 800-2 500 | 1 400-1 800 |
Wet and dry leisure centres | 4 500-9 000 | 1 400-1 800 |
Leisure pools | n/a | 1 800-2 300 |
Out-of-town health and fitness club (shell and fit-out – including pool) | 3 200-4 200 | 800-1 200 |
Town-centre health and fitness club | ||
(fit-out – excluding pool) | 950-2 500 | 800-1 250 |
Leisure centre extension to hotels | ||
(shell and fit-out – including pool) | 450-800 | 1 250-1 750 |
Shopping centres | ||
Development type | Unit cost £/m2 gifa | |
Shopping centre, new build | ||
Shopping centre mall; comfort cooled | 2 200-3 500 | |
Shopping centre food court | 2 500-3 600 | |
Factory outlet centre mall – enclosed | 2 000-3 000 | |
Factory outlet centre mall – open | 350-600 | |
Retail shells, capped-off services only | 500-800 | |
Shopping centre, refurbishment | ||
Shopping centre mall; limited scope | 700-1 050 | |
Shopping centre mall; comprehensive | 1 000-1 500 | |
Leisure shell | 600-900 | |
Multiplex cinema, shell only | 600-850 | |
Regional variations | |
All costs are, except where noted, based on schemes in the South-east. Costs for other areas should be adjusted. | |
Inner London | 1.10 |
Outer London | 1.04 |
South-west | 0.95 |
East Midlands | 0.93 |
West Midlands | 0.93 |
East Anglia | 0.94 |
Yorkshire and Humberside | 0.93 |
North-west | 0.98 |
North | 0.92 |
Scotland | 0.94 |
Wales | 0.92 |
Northern Ireland | 0.79 |