Keep up to dateMechanical suppliers | |
AHUs: | Euroair |
Boilers: | Hoval (existing refurbished) |
Burners: | Nu-way (existing refurbished) |
Ceiling diffusers: | Senior Air (Coleman) |
Chillers: | Carrier |
Computer room a/c: | Airedale |
Dampers: | Actionair |
Drainage (above ground): | Ensign |
Dry riser pipework and inlet boxes: | Wormald |
Ductwork: | Imperial ductwork |
Extract fans: | Roof Units Group |
Fan coil units: | Quartz |
Flues: | Selkirk |
Louvres: | Superform |
Pumps: | Armstrong & Baric |
Pressurisation: | Armstrong |
Radiant panels: | Strada |
Radiators: | Sensotherm |
Sound attenuation: | Allaway Acoustics |
Sprinklers: | Wormald |
Toilet extract: | Roof Units |
Valves & strainers: | Hattersley |
Water treatment: | Goodwater |
Water boosters: | Pullen (existing) |
Water heaters (gas-fired): | Beaumont (existing refurbished) |
Electrical suppliers | |
BEMS: | Trend/Robell |
CCTV: | SDA |
Cable management: | Kinstrut |
Controls: | Robell |
Electrical distribution: | MEM |
Electrical accessories: | MK |
Fire alarm/detection: | ADT |
Floor boxes: | Britmac |
HV switchgear: | Hawker Siddeley |
Lifts: | Otis |
Lighting controls: | Home Automation |
Luminaires: | Zumtobel |
LV switchgear: | ABB Durham Switchgear |
Power busbar: | Barduct |
Public address: | ADT (part of fire system) |
Standby generation: | Broadcrown |
Trace heating: | Jimi-Heat |
Specifications | |
Engineering data | |
Floor areas (whole building) | |
Gross: | 23 320 m2 |
Net usable area: | 20 153 m2 |
Plant rooms: | 2087 m2 |
Landlord areas: | 3910 m2 |
Tenanted switch spaces: | 7366 m2 |
Amenity & dining: | 70 m2 |
Contract details | |
Tender system: | Negotiated |
Form of contract: | JCT management contract |
Contract period: | Oct 1998 to Oct 1999 |
NES used: | No |
U-Values (W/m2K) | |
Walls: | 0·45 |
Floor: | 0·60 |
Roof: | 0·45 |
Glazing: | 5·6 |
Structural details | |
Slab thickness: | 150-180 mm |
Clear floor void: | 600 mm |
Floor to ceiling: | 3000 mm |
Ceiling zone: | 1100 mm |
Net services zone: | 500 mm |
Live load: | 5 KN/m2 (general)/10 kN/m2 (roof plantrooms) |
External design conditions | |
Winter: | -4°C/Sat |
Summer (a/c): | 28°C db, 19°C wb |
Internal design conditions | |
Winter: | 13°C to 23°C dry bulb (switch areas 23°C all year round) |
Summer (a/c): | 23°C/20-80% saturation |
Occupancy | |
Offices: | 1 person/20 m2 |
Meeting rooms: | 1 person/2 m2 |
Typical occupied hours: | 24 h, 365 days/y |
Diversity (hours/week): | 168 |
BREEAM rating: | No |
Noise levels | |
Offices: | NR 38 |
Toilet & circulation: | NR 40 |
External breakout limits: | 70 dB(A) at 1 m |
Ventilation | |
Scheduled supply air temp: | 15°C winter, ambient in summer |
Fresh air: | 100% min |
Filtration EU category: | EU5 |
Primary air volumes | |
AHUS at: | 8·80 m3/s (1 x general) |
AHUS at: | 0·56 m3/s (1 x toilet) |
Loads | |
Calculated heating load: | 0·8 MW |
Installed heating load: | 1·5 MW (existing) |
Cooling (future increase) | |
Calculated: | 3·7 MW (4·9 MW) |
Installed: | 3·7 MW (4·9 MW) |
Distribution circuits | |
LTHW: | 82°C flow, 71°C return |
DHWS: | 60°C flow, 55°C return |
Constant temp: | 82°C 71°C return |
Chilled water: | 6°C flow 12°C return |
Refrigerant | |
Chillers & computer room: | R134a |
Electrical supply | |
4·5 MVA + 2·5 MVA upgrade | |
3 x 1600 kVA transformers + 1 x 2·5 MVA upgrade | |
7·5 MVA standby power | |
Lighting | |
Type: | fluorescent (access and plantrooms) |
Lux levels | |
switch spaces: | tenant fit-out |
meeting: | 300 lux |
kitchen: | 300 lux |
toilets: | 150 lux |
stairs: | 200 lux |
corridors: | 200 lux |
Lifts | |
Existing passenger lift refurbished: | hydraulic, 630 kg, 0·5 m/s |
I x new passenger lift: | hydraulic, 630 kg, 0·63 m/s |
2 x existing goods lifts, refurbished: | 1 x 3000 kg, 0·5 m/s, 1 x 2500 kg, 0·5 m/s |
Costs | |
Costs (excl. fees and power upgrade) | |
Total cost: | £17 million |
Total building services: | £7.6 million |
Services costs in £millions (£/m2 nfa) | |
Mechanical services: | £3.05 (£183/m2) |
Electrical services: | £4.55 (£274/m2) |
Total m&e services: | £7.60 (£457/m2) |
Main services costs | |
Meters & switchgear: | £1 400 000 |
Power installation: | £1 100 000 |
Ventilation: | £830 000 |
Cooling systems: | £760 000 |
Security: | £500 000 |
Sprinklers: | £390 000 |
Lighting: | £300 000 |
Heating systems: | £295 000 |
Controls: | £250 000 |