Project: Worcester PFI Hospital
Head client: Worcestershire Acute Hospitals NHS Trust
Client: Catalyst Healthcare (Worcester)
Design and build contractor: Bovis Lend Lease
Architect: RTKL
M&E consulting engineer: Oscar Faber
Lighting designer: Oscar Faber
M&E contractor: ABB Building Technologies
Contract details  
Tender date: September 1999
Form of contract: Amended Dom 1
Contract period: 24 months for m&e installation, 33 months for total project
Providers  
Mechanical  
AHUs: ABB Flakt
Boilers: Hartley and Sugden
Chillers: Climate
Control valves: Satchwell
Computer room a/c: Mitsibushi
Above ground drainage: Key Terrain
Ductwork: ABB Veloduct
Extract fans: Woods
Fan coil units: ABB Flakt
Flues: Hamworthy
Humidifiers: JS Humidifiers
Perimeter heating: Solray (Radiant Panels)
Pumps & pressurisation: Pullen
Radiant panels: Solray
Radiators: Sensotherm
Sound attenuation: TEK
VAV boxes: ABB Flakt
Water heaters: Zip
Electrical  
BMS: Satchwell
CCTV: ADT
Cable: Pirelli
Cable management: Mita Cablofil
Electrical distribution: ABB
Electrical accessories: MEM
Fire alarm/detection: ADT
HV & lv switchgear: ABB
Power busbar: MEM
Public address: ADT
Security equipment: ADT
Standby generation: Puma
Trace heating: Delta T
UPS: Schneider
Voice and data equipment: Molex / Siemens
Prices  
Total: £82 million for design and build contract
M&E and public health services sub-contract: £21 million