Keep up to dateCosts | |
Total cost: | £1.82 million |
Building services total: | £465 522 |
Total net cost (£/m2): | 802 |
Mech services cost £/m2: | nfa £103.66 |
Electrical services £/m2: | nfa £101.69 |
Specification and details | |
Engineering data | |
Net usable area: | 2267 m2 |
Plant rooms: | 90 m2 |
Computer suite: | 538 m2 |
Amenity & dining: | 769 m2 |
Atria: | 287 m2 |
Contract details | |
Tender date: | 25 October 1999 |
Tender system: | Open tender |
Form of contract: | Domestic sub-contract |
Contract period: | 52 weeks |
Was NES used on this project?: | Yes |
External design conditions | |
Winter: | -3°C/Sat |
Summer (a/c): | 26°C db, 19°C wb |
Internal design conditions | |
Winter: | 18-20°C min |
Summer (non a/c): | 24-26°C |
Summer (a/c): | 22 ±2°C 45-55% rh |
Circulation & toilets: | 16°C min |
U-Values (W/m2K) | |
Walls: | 0·25 south 0·35 elsewhere |
Floor: | 0·45 |
Roof: | 0·25 |
Glazing: | 3·2 |
Structural details | |
Slab thickness: | 200 mm approx |
Clear floor void: | 250-400 mm (sub-basement only) |
Floor to ceiling: | 3000 mm |
Ceiling zone: | 500 mm |
Net services zone: | 300 mm |
Noise levels | |
Offices: | 35 NR |
Target energy use (gfa) | |
Gas: | 81 kWh/m2/y |
Electricity: | 63 kWh/m2/y |
CO2 target: | 48·2 kg/m2/y |
Typical occupied hours: | 9am – 6pm, distance learning 24hrs |
BREEAM: | No |
Loads | |
Calculated heating load: | 300 kW |
Installed heating load: | 300 kW |
Calculated cooling load: | 50 kW |
Lighting: | 15 W/m2 |
Installed lighting: | 15 W/m2 |
Ventilation | |
Scheduled supply air temp: | 19°C |
Max recirculation: | 50% on AHU |
Filtration EU category: | EU7 |
Primary air volumes | |
ahus at: | 4·7 m3/s |
Catering: | 2·15 m3/s |
Distribution circuits | |
LTHW: | 82°C flow, 71°C return |
DHWS: | 60°C flow |
Constant temp: | 82/71°C |
Chilled water: | 6/12°C |
Refrigerant: | R134a |
Chillers: | 50 kW |
Electrical supply | |
kVA transformers: | Link to site switchboard |
Lighting | |
Types: | T5 fluorescent/Compact fluorescent/T8 fluorescent |
Lighting load: | 34 kW |