Project information
Contract period: 31 months
 
Providers  
Mechanical  
AHUs: McQuay
Boilers: Veissmann
Chillers: Carrier
Control valves: Satchwell
Computer room a/c: Stulz
Drainage above ground: Ensign Timesave
Ductwork: Galloways
Extract fans: Woods
Fan coil units: Biddle
Floor grilles: Waterloo
Gas boosters: Nuway
Heat exchangers: Spirax Sarco
Insulation: Kooltherm
Pumps and pressurisation: Pullen
Radiators: Zehnder
Underfloor heating: Reittag
VAV boxes: Barcol-Air UK
 
Electrical  
BMS: Satchwell
CCTV: ADT
Cable: Delta
Cable management: Swift, Arena, Roolf King
Controls: Satchwell
Electrical distribution: Schneider Electric
Electrical accessories: MK Electric, Wandsworth
Fire alarm/detection: Gent
Floorboxes: Electract
HV switchgear: MEM
LV switchgear: Schneider Electric
Lighting: Thorn
Security equipment: ADT
Standby generation: Broadcrown
UPS: Chloride
Voice and data equipment: Pandi
Water leakage detection: Andell
 
Prices  
Total: £300 million
Mechanical services: £25 million
Electrical services: £25 million
 
Note: The costs quoted above are approximate for the construction project.