Project information
Mechanical suppliers  
AHUs: Dalair
Air curtains: Shear Flow
Anit-vibration mounts: Minikin
Boilers: Hoval
Burners: Reillo
Ceiling diffusers: Waterloo
Control valves: Siemens
Computer room a/c: Toshiba
Ductwork: Mansfield Pollard
Extract fans: Fans Direct
Floor grilles: Waterloo
Flues: Hamworthy
Pumps: Grundfoss
Pressurisation: Grundfoss
Radiators: Stelrad
Sound attenunation: Sound Attenuators
Tanks: Brimar
Underfloor heating: Retig
Water treatment: Liff
Valves: Holmes
Water boosters: Grundfoss
Water heaters: State Water Heaters
Electrical suppliers  
BEMS: Landis/Staefa
CCTV: ADT
Cable management: Walsall/Arena
Controls: Landis/Staefa
Electrical distribution: Groupe Schneider /Square D
Electrical accessories: MK/Wandsworth
Fire alarm/detection: APT
Floor boxes: Ackermann-Grass - 9
HV Switchgear: Groupe Schneider
Lifts: Independent Lifts
Lighting controls: Dynalite / (I-Lite)
Luminaires: Erco/Meyer/Thorn/
Sill/ Encapsulite/Weef/Meyer/Stonco/
Oldham/Leclyon/Enliten/Concord/
Louis Polsen/Hoffmeister/Inlico/Strand/Etc
LV Switchgear: Square-D
Motor Control Centres: Landis/STaeFA
Public address: ADT
Emergency lighting: Cooper Menvier
Loads  
Installed heating load: 1·07 MW
Installed cooling load: 0·105 MW
Ventilation - entrance  
Scheduled air temp: 18°C
Room temp: 18°C min
Fresh air: 100% min
Distribution circuits  
LTHW: 85°C flow; 65°C return
Refrigerant (Computer room) R407c
Electrical supply 2 x 800 kVA
Internal design conditions  
Winter: pavillions 16°C min; entrance 19°C min
Summer (non a/c): 29°C
Summer (a/c): 24°C
External design conditions  
Winter: -4°C/Sat
Summer (a/c): 24°C db, 19°C wb
U-values (W/m2K)  
Walls: 0·3
Floor: 0·45
Roof: 0·3
Glazing: 0·3
Target energy use  
Gas: 1 837 000 kWh/y
Electricity: 3 141 000 kWh/y
Typical occupied hours: 8 h/day, 7 days/ week
Costs  
Total cost: £35.4 million
Building services: £2 million base build;
£0.85 million exhibition;
£0.6 million exhibition lighting