- News
All the latest updates on building safety reformRegulations latest
- Focus
- Comment
- Programmes
- CPD
- Building the Future
- Jobs
- Data
- Subscribe
- Events
2024 events calendar
Explore nowBuilding Awards
Keep up to date
- Building Boardroom
All the latest updates on building safety reform
2024 events calendar
Explore nowBuilding Awards
Keep up to dateDesign issues for specialist space | |
Libraries and learning resource centres | |
Design drivers | Solutions |
Continuing expansion of library collections | Greater use of electronic journals, provision of flexible internal accommodation to allow for growth of hard and soft copy collections |
Increasing requirements for group-based working | Provide separate spaces for quiet and group working and special consideration of acoustic management in open-plan areas |
Greater use of IT | Provide central IT resource areas to reduce network costs and to control noise. Increase space allowances to permit screen and desk working. Provide quiet work space for book-based study |
Environmental control | Maximise natural ventilation and daylight where possible. Restrict use of cooling to archive and IT areas only where conditions require it |
Research facilities | |
Need to attract research scientists and external funding | High-quality architecture, high standards of internal and external environment and up-to-date equipment |
Facilitation of creative multidisciplinary working | Provision of hierarchy of workplaces to enable group and solo working and range of spaces to encourage interaction |
Flexibility to accommodate change | Flexible fit-out and servicing solutions that facilitate replanning and restacking |
Separation of undergraduate teaching and graduate research activities | Clear separation of activities either through the development of stand-alone buildings or the internal planning of larger schemes |
Laboratories | |
Close environmental control | Extensive, high-capacity building services, large ceiling voids, solid floor slabs to control vibration and avoid infestation in floor voids |
Quality of working environment | Quality of write-up areas, flexibility of lab space and quality of natural light and air-conditioning systems |
Flexibility | Modular laboratory design and services distribution, easily accessible services installations, independent structure and services |
Security to protect research projects and equipment | Physical and electronic security measures, balanced against requirements to promote interaction between researchers. Specialist security for animal houses and other high-risk areas |
Teaching spaces | |
Flexible floorplates | Column-free space, lightweight partitions, regular planning grid, small power and IT distribution equivalent to commercial office standards to provide flexibility for replanning |
High-quality space | Shallow floor plates of 12-15 m for daylight and natural ventilation, clear orientation, use of atriums to provide circulation and social space, use of good-quality, robust materials |
Low operational costs | Natural ventilation, limited cooling and ventilation for peak lopping only, and use of cost-effective sustainability features |
Cost breakdown | ||
Element cost | cost/m2 gfa £ | |
Substructure | 979,000 | 222.5 |
Basement construction; excavation and disposal; reinforced insitu concrete ground beams, walls and suspended slab; vapour barrier and protection board; average depth 4.60 m 1300 m2 @ 400 | ||
Piling; 600 diameter; average 35 m long; testing; disposal 48 @ 2500 | ||
Contiguous piling; 450 and 600 diameter; average 17 m long; testing; disposal 190 @ 1400 | ||
Allowance for additional foundation works Item @ 3000 | ||
Allowance for incoming services Item @ 70,000 | ||
Frame and upper floors | 718,000 | 163.18 |
Insitu reinforced concrete columns, core walls and suspended slabs; 400 thick 4000 m2 @ 170 | ||
Extra for exposed trough slab; 400 thick 1450 m2 @ 8 | ||
Structural steel frame; hollow sections at roof level; surface finishes; erection 24t @ 1100 | ||
Roof | 307,100 | 69.8 |
Zinc raised seam roofing; 0.8 mm thick; low pitch; softwood roof members, plywood deck; vapour barrier, insulation 425 m2 @ 130 | ||
Inverted mastic asphalt roof; lightweight screed, average 105 thick; isolating layer; rigid board insulation; gravel ballast, 80 mm thick; including detailing to kerbs for plant and rooflights 495m2 @ 120 | ||
Proprietary opening rooflights; double glazed; Velux; average size 1 m2 32 @ 1000 | ||
Purpose made patent glazing; aluminium glazing bars; sealed double glazed units 280 m2 @ 350 | ||
Allowance for flashings; fascias; sheathing felt etc Item @ 20,000 | ||
Rainwater goods; gutters and roof outlets Item 14,000 | ||
Cleaning gantry Item @ 18,000 | ||
Mansafe system Item @ 5,200 | ||
Pavement rooflights; smoke vents 12 m2 @ 440 | ||
Stairs | 97,000 | 22.05 |
Insitu reinforced concrete stairs and half landings; 1600 wide; 3.7 m average rise 8 @ 4800 | ||
Allowance for balustrades and handrails 190 m @ 140 | ||
Allowance for roof level access ladders 4 @ 3,000 | ||
Allowance for catwalks and platforms in plant rooms Item @ 20,000 | ||
External walls | 208,500 | 47.39 |
Cavity wall construction; facing bricks; blockwork; DPCs; insulation; lintels 345 m2 @ 100 | ||
Cavity wall construction; facing bricks; built against concrete walls; DPCs; insulation; lintels 690 m2 @ 80 | ||
Precast concrete copings 250 m @ 75 | ||
Windows and external doors | 301,200 | 68.45 |
Proprietary steel-framed, double-glazed windows; polyester powder-coated 75 m2 @ 380 | ||
Curtain walling; steel frame; sealed double-glazed units ; insulated steel-faced spandel panels; polyester powder-coated 470m2 @ 450 | ||
Clerestory windows; sealed double-glazed louvre motorised units; controls 30 m2 @ 900 | ||
External doors; double-glazed, steel-framed doors and doorsets; polyester powder-coated; stainless steel ironmongery 10 @ 1700 | ||
External doors; aluminium louvre doors and doorsets; polyester powder-coated; stainless steel ironmongery 7 @ 800 | ||
Allowance for security shutters Item @ 2000 | ||
Window boards; painted 320 m 30 | ||
Internal walls and partitions | 160,000 | 36.36 |
Partitions; facing blockwork; 150 average thickness (average rate); ancillaries 1340 m2 @ 40 | ||
Extra over for 215 thick blockwork 450 m2 @ 15 | ||
Stud partition; ancillaries; acoustic sealants 1600 m2 @ 50 | ||
Allowance for fire-rated drylining to service risers 360 m2 @ 40 | ||
Cubicle partitions; polyester powder-coated, steel-faced composite panels 12 @ 440 | ||
Internal doors | 177,900 | 40.43 |
Flush doors; solid core; ply-faced; vision panels; wrot softwood frame; 30/30 fire resistance; stainless steel door furniture; decorations 200 @ 800 | ||
Extra for; oak veneer finish 70 @ 170 | ||
Allowance for borrowed lights Item @ 6000 | ||
Wall finishes | 71,600 | 16.27 |
Plasterboard wall linings; timber battens; ancillaries 2070 m2 @ 14 | ||
Two-coat plasterwork 1060 m2 @ 10 | ||
Skim coat; to plasterboard 760 m2 @ 4 | ||
Ceramic tiles 100 m2 @ 50 | ||
Painting plaster two coats emulsion paint 8000 m2 @ 3 | ||
Floor finishes | 348,000 | 79.09 |
Hardwood flooring; clear lacquer finish 100 m2 @ 80 | ||
Raised access floor; 150 average cavity depth; dust sealer to cavity 2600 m2 @ 50 | ||
Extra for acoustic and fire cavity barriers 2600 m2 @ 5 | ||
Allowance for floor diffusers 260 @ 100 | ||
Allowance for services bridges Item @ 5000 | ||
Screeds; sand cement and proprietary concrete screeds; average 60 thick; | ||
average rate used 825 m2 @ 20 | ||
Extra for insulation board 140 m2 @ 18 | ||
Carpet tile; to general areas 2900 m2 @ 30 | ||
Rubber tile safety flooring; skirting 210 m2 @ 56 | ||
Rubber sheet flooring; to general areas 680 m2 @ 37 | ||
Floor paint; to plant rooms 390 m2 @ 4 | ||
Softwood skirting; painted 1950 m @ 10 | ||
Ceiling finishes | 63,900 | 14.52 |
Allowance for mats and matwells Item @ 2000 | ||
Suspended ceilings; plasterboard on MF; access panels; paint finish 750 m2 @ 30 | ||
Allowance for radiant panel ceiling Item @ 22,000 | ||
Plasterboard linings; access panels; paint finish 560 m2 @ 20 | ||
Painting; to exposed concrete ribbed soffits; one coat clear sealer 4100 m2 @ 2 | ||
Furniture | 307,000 | 69.77 |
Purpose-made fixed furniture; tables and seating to non-teaching areas Item @ 150,000 | ||
Reception desk Item @ 20,000 | ||
Lecture theatre and seminar room equipment; whiteboards, hanging rails, | ||
flipcharts and pinboards Item @ 60,000 | ||
Fixed seating to lecture theatre 200 @ 150 | ||
Window blinds 300 m2 @ 50 | ||
Motorised blind to skylight Item @ 5000 | ||
Blackout blinds to teaching spaces Item @ 25,000 | ||
Statutory and orientation signage Item @ 2000 | ||
Sanitary fittings | 54,400 | 12.36 |
WCs, urinals, washhand basins, fittings; cleaners’ sinks; complete (average rate) 80 @ 260 | ||
Extra for fittings for disabled WCs 5 @ 400 | ||
IPS system panels; including access panels; ancillaries 80 m2 @ 200 | ||
Modular washroom units; stainless steel 8 @ 1600 | ||
Hand dryers 14 @ 200 | ||
Disposal installations | 103,600 | 23.55 |
Rainwater downpipes, outlets and connections to drains 4400 m2 @ 10 | ||
Extra for basement drainage 1300 m2 @ 12 | ||
Waste, soil and vent installation; PVCu pipework and fittings 4400 m2 @ 10 | ||
Water installations | 83,400 | 18.95 |
Mains water; cold water storage and distribution, water treatment 4400 m2 @ 10 | ||
Hot water installation; calorifiers; distribution; insulation 4400 m2 @ 6 | ||
Local water heaters; distribution; insulation Item @ 13,000 | ||
Space heating and air treatment | 583,600 | 132.64 |
Boiler; 575 kW, pumpset and pipework in plantroom; flue Item @ 62,000 | ||
Chilled water plant; 260kW; pipework and valves in plantrooms and risers Item @ 49,000 | ||
Air handling units; supply and extract; total mass flow rate 17 kg/s Item @ 82,000 | ||
LTHW distribution pipework; ancillaries; insulation 4400 m2 @ 20 | ||
Chilled water distribution pipework; ancillaries; insulation 1930 m2 @ 10 | ||
Supply and extract ductwork; grilles and diffusers; ancillaries; including allowances for two-hour fire-rated smoke extract ductwork 1930 m2 @ 90 | ||
LTHW heating; trench heating Item @ 26,000 | ||
LTHW heating; panel radiators Item @ 34,000 | ||
Allowance for radiant panel heating and cooling installation to double height spaces 485 m2 @ 40 | ||
Allowance for supplementary cooling to ICT rooms; packaged DX units Item @ 17,000 | ||
Toilet extract installation 4400 m2 @ 3 | ||
Electrical installations | 444,500 | 101.02 |
Mains and sub – mains installation 4400 m2 @ 20 | ||
Small power installation 4400 m2 @ 20 | ||
Extra over for small power to offices and IT areas; floor outlet boxes 1800 m2 @ 5 | ||
Lighting and luminaires; generally 4400 m2 @ 35 | ||
Extra for enhanced lighting; public spaces and cellular offices 1700 m2 @ 45 | ||
Emergency lighting; generally 4400 m2 @ 5 | ||
Power supply installation to mechanical equipment Item @ 7000 | ||
Gas installation | 13,000 | 2.95 |
Gas supply to central boiler and kitchen area Item @ 13,000 | ||
Lift installation | 86,000 | 19.55 |
Four-person electric traction lift serving five floors 2 @ 43000 | ||
Protective installations | 22,200 | 5.05 |
Lightning protection 4400 m2 @ 2 | ||
Earthing and bonding 4400 m2 @ 1 | ||
Dry riser 1 @ 9000 | ||
Communications installation | 152,900 | 34.75 |
Fire alarm installation; smoke detectors; call points 4400 m2 @ 15 | ||
Disabled alarm Item @ 3000 | ||
Structured cabling installation; 120% capacity 1250 m2 @ 25 | ||
Security and access control system; intruder alarm 4400 m2 @ 4 | ||
Allowance for CCTV system Item @ 20000 | ||
Telephone and data wireways; for ICT, CCTV and security systems Item @ 15000 | ||
Special installations | 110,000 | 25 |
Building management system 4400 m2 @ 25 | ||
Builder's work in connection | 82,700 | 18.8 |
Forming holes, chases etc Allow 5% Item @ 82700 | ||
Preliminaries and contingencies | 995,800 | 226.32 |
Testing and commissioning of services; record drawings Item @ 10,000 | ||
Management costs, site establishment and site supervision Allow 13% Item @ 711,800 | ||
Contingency sum Allow 5% Item @ 274,000 | ||
Total construction cost – building only | 6,471,300 | 1470.75 |
Location factors | |
Inner London | 1.06 |
South-east | 0.97 |
South-west | 0.91 |
East Midlands | 0.90 |
West Midlands | 0.89 |
East Anglia | 0.91 |
Yorkshire and Humberside | 0.85 |
North-west | 0.90 |
Northern | 0.86 |
Scotland | 0.87 |
Wales | 0.85 |
Northern Ireland | 0.73 |
Indicative costs of university buildings | |
Building type | £/m2 gifa |
Humanities teaching building | 1100 to 1600 |
Science laboratory buildings | 1500 to 2400 |
Libraries | 1300 to 2000 |
Learning resource centres | 1300 to 1800 |
Lecture theatres | 1300 to 1500 |
Costs are current in fourth quarter 2002, based on a location in outer London. Costs are for the building only, and exclude demolitions, loose furniture and fittings, external works, professional fees and VAT. |