Welcome to building.co.uk. This site uses cookies. Read our policy.

A - Base building: Steel-framed, air-conditioned office
Basic information
Gross internal floor area: 11,700 m²
Form: Six storeys high and 15 m deep on plan
Construction: Steel frame of 44 kg/m²
Substructure: 200 mm groundbearing slab, bearing on to 2.5 m deep pad foundations
Roof: Flat, Sarna single-membrane proprietary roofing system with parapets
External walls: Mostly wall cladding with reconstituted stone. Ten per cent is polyester powder coated aluminium curtain-walling, fully glazed to clear height with double-glazed low-emissivity glass
Window frames: Aluminium for about 60% of clear height
Windows: Double-glazed, low-emissivity glass
Air-conditioning: Chilled beams with displacement ventilation in a raised floor plenum of 400 mm deep
Lifts: Three passenger and one goods
  
Capital costs (£) (excluding fees)
Substructure £544,010
Structure £2,013,435
External envelope £3,090,609
Internal divisions £528,842
Finishings and fittings£2,805,140
Mechanical £3,707,744
Electrical and communications £2,486,371
Lifts £594,093
Preliminaries, overheads and profit £2,680,646
Design and construction contingency @ 8% £1,475,933
Total £19,925,000
  
Annual energy consumption (£)
Space heating £9,457
Cooling and fans £32,872
Lighting £14,165
Other energy costs £35,194
Total (over 30-year period) £91,688
D - Environmental impact
  CO2 outputEcopoints
 QuantityRatingTonnesRatingTotal
Steel frame with composite floors
Pad foundations263 m³0.3181.535.31,393.90
Steel frame515 t0.76391.4115,665.00
Note: The above ratings accept the steel industry’s calculation methodology (previously questioned)
Hot-dip galvanized steel permanent formwork9.215 t1.3412.3511101.37
140 mm lightly reinforced concrete1290 m³0.37477.35.36,837.00
 
Total for steel frame option excluding operation  963 13,997
CO2 produced over 30 years30 years77523,250  
 
CO2 total emissions for steel frame option including operation  24,213  
 
Insitu concrete frame and floors
Pad foundations440 m³0.31136.45.32,332.00
Reinforced concrete columns323 m³0.38122.745.31,711.90
Reinforced concrete beams59 m³0.3822.425.3312.7
(Taken to perimeter, but can be avoided)     
Reinforced concrete floors2675 m³0.381,016.505.314,177.50
 
Saving 200 mm wall height per level (approx)–341 m²0.1-34.11.1–375.10
 
Total for insitu concrete option excluding operation  1,264 18,159
CO2 produced over 30 years30 years71821,540 N/A
 
CO2 total emissions for insitu concrete option including operation 22,804   
 
Summary of changes
 
Overall extra for concrete option excluding building operation 301 (up 31%) 4,162 (up 30%) 
 
Overall saving for concrete option including building operation 1,409 (a 6% saving on total energy costs)