The costs are, unless otherwise noted in the text, appropriate for projects in the South-east and should be adjusted by the following location factors for schemes in other regions. | |
Inner London | 1.09 |
Outer London | 1.03 |
South-west | 0.95 |
East Midlands | 0.91 |
West Midlands | 0.92 |
East Anglia | 0.96 |
Yorkshire & Humberside | 0.91 |
North-west | 0.93 |
Northern | 0.92 |
Scotland | 0.89 |
Wales | 0.91 |
Northern Ireland | 0.75 |
Car parks - Current construction costs | ||
Unit size m2/car | Unit cost £/space | |
Surface | 20-23 | 1,000-1,500 |
Surface landscaped | 20-25 | 1,500-2,500 |
Grade and upper level | 23-32 | 5,000-7,000 |
Multistorey flat slab | 24-32 | 8,000-14,000 |
Basement with mechanical ventilation | 28-34 | 22,000-26,000 |
Warehouses and distribution centres - Current construction costs (shell only) | |||
Up to 10,000m2 £/m2 (gifa) | 10,000m2 to 20,000m2 £/m2 (gifa) | over 20,000m2 £/m2 (gifa) | |
Low bay (6-9m) | 300-460 | – | – |
Low bay (10-15m) | – | 270-350 | 200-270 |
High bay (16-24m) | – | 290-380 | 220-350 |
Fit-out – tenant’s mechanical handling and chilled store installation | – | – | 425-790 |
Business park offices - Current construction costs (including developer’s finish) | ||
Less than 2,000m2 £/m2 (gifa) | More than 2,000m2 £/m2 (gifa) | |
Functional – non air-conditioned | 700-900 | 650-850 |
Medium quality – non air-conditioned | 800-1,000 | 750-950 |
Medium quality – air-conditioned | 900-1,050 | 850-1,050 |
Good quality – naturally ventilated to meet BCO specification (exposed soffits, motorised windows and solar shading) | 950-1,050 | 900-1,050 |
High quality – air-conditioned | 950-1,250 | 900-1,300 |
West End and city-centre office buildings - Current construction costs (including developer’s finish) | |
£/m2 (gifa) | |
Regional cities – high-quality speculative offices, air-conditioned | 1,150-1,450 |
City and West End – high-quality speculative offices, 8-20 storeys; air-conditioned | 1,400-1,900 |
City fringe – deep-plan speculative office towers, air-conditioned | 1,700-2,000 |
City and West End – iconic speculative office towers, air-conditioned | 1,900-2,400 |
Note: Cost of the City and West End speculative and owner-occupied offices are based on a Central London location. The regional city office costs are based on a South-east location |
Office refurbishment - Current construction costs (including developer’s finish) | |
£/m2 (gifa) | |
Minor refurbishment | 220-720 |
Medium refurbishment | 700-1,100 |
Major refurbishment | 1,100-1,600+ |
Note: Costs are based on a central London location |
Office fit-out - Current construction costs | ||
Indicative costs for fit-out of office space from shell-and-core condition | ||
City/West End offices £/m2 (nia) | Out-of-town offices £/m2 (nia) | |
Developer’s fit-out to general office areas | 325-450 | 250-325 |
General office space - open plan | 425-550 | 275-400 |
General office space - part cellular | 525-800 | 350-550 |
Senior executive offices | 600-900 | 550-900 |
Conference suites | 1,100-1,500 | 1,000-1,500 |
Sub-equipment room | 1,500-1,900 | 1,200-1,700 |
Restaurant | 1,150-1,950 | 1,100-1,950 |
Kitchen | 2,100-2,600 | 2,000-2,600 |
Note: Fit-out costs are taken from shell and core condition. Cost of City/West End office fit-outs are based on a central London location. The out-of-town office fit-out costs are based on a South-east location. All rates are based on net internal floor area. |
Stadiums and grandstands - Current construction costs | |
£/seat | |
Basic stand; WCs and concession areas only | 500-900 |
Regional stand/stadium; WCs, concession areas and limited hospitality | 1,000-1,700 |
Regional feature stand/stadium; changing facilities, offices, retail/hospitality areas and conference facilities | 1,500-3,000 |
National/iconic stadium; full facilities including retail, hospitality and conferencing; allowances at the upper end of the scale include retractable roof and pitch | 3,000-5,000 |
Indoor arena with permanent ice pad and demountable running track, with 50% retractable seating. (Unit costs based on higher seating capacity achieved in ice rink configuration.) | 4,500-5,500 |
Note: Estimating the construction costs of stadiums, grandstands and arenas should be based on a clear understanding of the cost drivers of a specific scheme. There are many development variables that may not directly be affected by the number of seats. These include: tier arrangement, roof structure, sightlines, building footprint and provision of additional space for hospitality/community use etc. Estimates prepared on a cost per seat basis without taking into account these variables could be inaccurate. |
Leisure centres - Current construction costs | ||
Indicative area m2 (gifa) | Unit cost £/m2 (gifa) | |
Dry leisure centre | 1,000-1,500 | 1,000-1,500 |
Wet and dry leisure centre | 4,500-9,000 | 1,650-2,300 |
Pool; 25 m long | 1,800-2,500 | 1,400-2,250 |
Pool; 50 m long, international competition standard | – | 2,500-3,100 |
Out-of-town health and fitness club (shell and fit-out, including pool) | 3,200-4,200 | 1,100-1,800 |
Museums and art galleries - Current construction costs | |
£/m2 (gifa) | |
International standard art gallery/museum | 2,500-3,500 |
Regional-standard art gallery/museum | 2,000-3,000 |
Local standard art gallery/museum | 1,500-2,200 |
Note: Costs exclude specialist gallery fit-out |
Theatres - Current construction costs (including developer’s finish) | |
£/m2 (gifa) | |
Large theatre (more than 500 seats) | 3,000-4,000 |
Studio theatre (fewer than 500 seats) | 2,200-3,000 |
Note: Costs include theatre equipment |
Hotels - Current construction costs | |||
Average gross floor area per room m2 gifa | Unit cost £/m2 gifa | £000s/ bedroom | |
Luxury city-centre hotel multistorey, conference and wet leisure facilities | 80-120 | 1,900-2,600 | 170-250 |
Business town-centre or provincial hotel four to six storeys, conference and wet leisure facilities | 70-100 | 1,400-2,100 | 80-140 |
Mid-range provincial hotel two to three storeys, conference and leisure facilities | 55-65 | 1,350-1,750 | 70-100 |
two to three storeys, bedroom extension | 35-45 | 1,200-1,600 | 45-65 |
City-centre aparthotel four to seven-storey apartments, self-catering facilities | 50-65 | 1,000-1,400 | 55-90 |
Budget city-centre hotel (new-build) four to six storeys, dining and bar facilities | 35-50 | 1,100-1,300 | 40-65 |
Budget city-centre hotel (office conversion) four to six storeys, excluding dining facilities | 32-38 | 800-1,250 | 25-50 |
Budget roadside hotel two to three-storey lodge, excluding dining facilities | 28-35 | 900-1,250 | 30-45 |
Schools - Current construction costs | |
Unit cost £/m2 (gifa) | |
Primary schools | 1,200-1,600 |
Secondary schools | 1,400-1,800 |
Note: Costs are inclusive of a typical allowance for abnormals, but exclude allowances for fixed and loose FF&E and ICT systems |
Hospitals - Current construction costs | |
£/m2 (gifa) | |
Diagnostic and treatment centres | 1,850-2,300 |
Acute services hospitals | 1,700-2,250 |
Radiotherapy and oncology units | 1,650-2,500 |
Community hospitals | 1,250-1,650 |
Social housing - Current construction costs | ||
Unit size m2 | Unit cost £/m2 (gifa) | |
Terrace, two-bedroom | 75 | 540-750 |
Semi-detached, three-bedroom | 90 | 650-800 |
Low-rise flats, two-bedroom | 62 | 750-950 |
Medium-rise flats, two-bedroom | 62 | 820-1,050 |
Private housing - Current construction costs (based on London location) | |
£/m2 (gifa) | |
Affordable apartments in mixed-tenure development – inner London | |
framed construction, basic cladding and curtain wall to complement the development, single-core layout, basic finishes, individual LPHW central heating | 1,350-1,500 |
Mid-market apartments in residential towers – outer London | |
framed construction, unitised curtain walling, single-core layout, medium quality finishes, centralised LPHW central heating | 1,700-2,050 |
High-quality multistorey apartments – inner London | |
framed construction, cladding and curtain walling, multiple-core layout, high-quality interior with good-quality floor finishes, partial comfort cooling, centralised LPHW central heating | 1,700-1,950 |
High-quality apartments in residential tower – inner London | |
framed construction, unitised curtain walling with high proportion of glazing, single-core layout with enhanced lift provision, high-quality finishes, centralised LPHW central heating and comfort cooling | 2,000-2,400 |
Prestige quality multistorey apartments – inner London | |
framed construction, high-quality stone and glass curtain walling, multiple-core layout, top-specification finishes, comfort cooling throughout, LPHW central heating | 2,200-2,400 |
Interior fit-out of apartment buildings only – inner London | |
social housing/shared ownership | 600-700 |
private apartments – good quality | 800-1,000 |
Shopping centres - Current construction costs | |
£/m2 (gifa) | |
New-build shopping centre | |
mall, comfort-cooled | 2,700–4,150 |
retail shells: | |
anchor tenants, capped off services | 650–950 |
medium/small store units, capped-off services | 600–850 |
public WCs | 2,150-2,500 |
centre management | 1,700-2,150 |
landlord’s back-of-house and service corridors | 1,300-1,600 |
basement service yard | 1,300-1,600 |
New-build factory outlet centre | |
retail units with enclosed mall | 2,350-3,800 |
retail unit with open mall | 430-800 |
Department stores - Current construction costs | |
£/m2 (gifa) | |
Department store fit-out | 1,000–2,200 |
Note: Rate is inclusive of all costs, including equipment, shopfitting, IT, telecoms, vehicles, fees etc. |
Supermarkets - Current construction costs (including developer’s finish) | |
£/m2 (gifa) | |
Shell | 250-500 |
Supermarket fit-out | 750-1,050 |
Hypermarket fit-out | 650-850 |
Note: Costs are £/m2 gross internal floor area, which includes back of house areas. The fit-out costs include all display and refrigeration units, check outs and IT systems. |