Keep up to dateCost comparisons | |||
The following table is based on OSM components for housing, schools, healthcare and offices compared with traditional construction. | |||
Component or assembly | Off–site manufacture costs (£) | On-site installation costs (£) | Comments |
Pre-assembled 600 kW boiler system | 35,000 | 39,000 | Includes boiler, pressurisation unit, pumps, valves and controls |
Roof-mounted plant room — heating (2 x 150 kW boilers) | 99,000 | 95,000 | Includes enclosure, associated and chiller plant (200 kW) pipework, insulation, pumps, pressurisation unit, condenser, controls. Note where cranage is available on site, the differential is decreased |
Prefabricated power cabling system | 15 £/m2 | 23 £/m2 | For office (>5000 m2) refurbishment. Power supply to luminaires and air conditioning system |
Bedroom modules fully furnished with en–suite bathroom | 11,000 | 10,000 | Bathroom includes bath, basin and WC |
Kitchen modules fully fitted | 14,000 | 12,500 | Kitchen units and space requirements above minimum social housing standards |
Modular dwelling units | 550 £/m2 | 550 £/m2 | External envelope and foundations are excluded |
Table notes | |||
Costs are indicative and are for labour and materials relating directly to the prefabricated units. Excluded are associated builder’s work; overheads; profit; preliminaries; professional fees; contingencies; tax allowances; VAT. | |||
General cost benefits from reduced construction times have not been evaluated. |