Keep up to dateHow Ludgate House could get a C | |||||||||
kg CO² per m² floor area | |||||||||
Heating | Cooling | Auxiliary | Lighting | Hot water | Total | Rating | |||
Notional building | 7.8 | 23.2 | 16.5 | 21.0 | 2.8 | 71.3 | 100% | C | |
1 | Ludgate House – base case | 25.5 | 41.2 | 27.2 | 20.4 | 2.0 | 116.3 | 162% | E |
2 | Improving U-value of glazing from 4 to 2.8 | 20.9 | 44.3 | 27.2 | 20.4 | 2.0 | 114.8 | 160% | E |
3 | Boiler efficiency improved from 0.65 to 0.7 | 18.6 | 44.3 | 27.2 | 20.4 | 1.8 | 112.3 | 156% | E |
4 | Wall U-value improved from 0.6 to 0.55 | 18.1 | 44.4 | 27.2 | 20.4 | 1.8 | 111.9 | 156% | E |
5 | Air permeability from 10 to 5 m3/h/m2 | 12.0 | 44.7 | 27.2 | 20.4 | 1.8 | 106.1 | 147% | E |
6 | System air-leakage tests passed | 10.3 | 38.6 | 23.1 | 20.4 | 1.8 | 94.1 | 131% | D |
7 | System energy metering with alarms | 9.9 | 36.6 | 22.0 | 20.4 | 1.8 | 90.7 | 126% | D |
8 | Lighting improved to HF triphosphor | 10.4 | 34.4 | 22.0 | 16.0 | 1.8 | 84.6 | 118% | D |
9 | Use of air-extracting luminaires | 10.5 | 33.6 | 22.0 | 16.0 | 1.8 | 83.9 | 117% | D |
10 | Cooling efficiency improved from 2.5 to 3 | 10.5 | 22.4 | 22.0 | 16.0 | 1.8 | 72.7 | 101% | C |
11 | Specific fan power improved from 3 to 2 | 10.9 | 21.1 | 16.8 | 16.0 | 1.8 | 66.6 | 93% | C |